Part3 for General Contractors
Part3 finds every required submittal by spec section, builds the log automatically, and helps your team catch gaps before they slow the project down.
THE GC'S CA REALITY
One bad submittal can put work on hold.
Resubmittals can create delays
A rejected package means another round of revisions and review before materials can move forward.
Requirements are easy to miss
Manually checking packages against specs means requirements can get overlooked.
Your team looks unprepared
When the architect catches something you should have caught first, it reflects on your team.
Automatically build your submittal log from the specs .
Drop in your specs and Part3 extracts the required submittals by spec section, giving your team a structured submittal log to work from.
No hand-keying CSI numbers. No discovering missing requirements months into the job.

Check every submittal before the architect does.
Part3 checks your submittal against the project specs and flags missing requirements, incorrect product data, and other issues that could send it back for revision.
See what the architect is likely to catch before you hit send.

BENEFITS FOR THE GC
Fewer resubmittals.
Fewer delays.
Catch issues sooner
Catch missing or off-spec information before the package goes for review.
Faster approvals
Avoid unnecessary review cycles that hold up material approvals.
No more manual logs
Turn your specs into a structured submittal log instead of building one line by line in a spreadsheet.
Fewer schedule surprises
Know what still needs to be submitted before it becomes a problem.
FAQ
Frequently asked questions.
Does Part3 replace Procore??
Part3 integrates with Procore and can replace fragmented systems (email, spreadsheets, shared drives) with one organized platform.
